What Does Termite Control Techniques Mean?

Some Of Termite Control Tenting


Many new buildings use a termicide treated layer of soil surrounding and under the building. This creates an integrated barrier, along with the physical techniques discussed above. The termicide is placed on the soil under the slab and around the footings, pipes, conduits and other structures of the house during construction to create a vertical barrier.

Timber used to construct homes, outbuildings, fences and other outdoor structures can be treated with chemicals. These are commonly referred toas treated timbers and should be considered in the time of designing or constructing the buildings.

The Only Guide for Termite Control Techniques


To successfully incorporate termite barriers into existing buildings, tactical drilling through concrete slabs, porches, flooring and wall footings might be needed, as well as under floor treatment.

Building and Energy recommends only licensed pest controllers carry out this job. Chemical baits Strategically put bait stations can be employed to lure termites into a food source, such as dry wood or newspaper refuse. About 30 bait stations are needed for a normal home and they need to be inspected regularly to assess termite activity. .

Once the termites are attracted to the bait station, a specific termicide is inserted that sticks to the termite.

The 20-Second Trick For Termite Control Techniques


To deal with termites in the garden, specialised pest managers drill into wood or the trunk of a tree to insert temperature probes which help locate the termite nest.  Despite regular inspections of the garden, termites can still enter your house. In the home, the first indicator may be a small discolouration of a wall , followed by warping if timber panelling is used to line the wall.

Make time to investigate the size and nature of the issue as well as the options offered for termite eradication. .

Whichever system you select, it is important to perform regular inspections in particular inspect your property every six months for any apparent signs of Our site infestation. Building and Energy recommends you arrange for an inspection by a licensed pest control operator at least once per year to search for signs of infestation and also to undertake any preventative steps. .

8 Easy Facts About Termite Control Techniques Explained


For existing buildings, in which you've found signs of infestation, chemical treatment is typically the only option for destroying the termite nest. This treatment can include re-establishing a compound and/or physical barrier plus regular inspections to discover any ongoing or new termite activity.

Treatment using a termicide into tunnels of the nest where termites are known to be active can reduce numbers, but it rarely eliminates the colony entirely unless it's used in conjunction with another method.

Getting My Termite Control Techniques To Work


When buying an existing house, Consumer Protection recommends including a White Ant Certificate clause in the Offer and Acceptance form. This is intended to create sure the home is free of termites and there is no structural damage from any prior infestation. Another fact sheet about the need for timber pest inspections and reports when buying property can be found from the Department of Commerce by contacting the Consumer Protection Advice Line on 1300 304 054. .

If you are constructing a new house or building or renovating an existing one you will need to obey the termite risk management and barrier requirements of the National Construction Code (NCC) and relevant standards. In most cases a building permit will be needed before carrying out building work and the details of the type of termite barrier should be filed as part of the building permit application process.

The 10-Second Trick For Termite Control TechniquesTermite Control Tenting Things To Know Before You Buy

The Buzz on Termite Control Technician Job Description


The NCC requirements aim to reduce the possibility of termite damage to main building elements which Resources are mostly the structural elements of a building butdo not include non-structural elements such as cabinet work and furniture.

It's a requirement of the NCC that a lasting notice be permanently fixed to the building in a prominent location, including in a meter box or so on. The notice should indicate the kind and method of termite risk management and also the date that the system has been installed, along with the installers or manufacturers recommendations for the extent and frequency of future inspections.

For specific information about termite protection for a planned new residence, contact a building surveyor, a builder or architect or a licensed pest control professional.

The Best Guide To Termite Control Technician Job Description


If you've had building work carried out in the past six years and the builder did not provide termite protection as needed by the NCC, you can refer the matter to the Building and Energy.

Plumbing leaks, drainage issues and roof leaks should all be addressed quickly, as damp conditions bring termites.

Not known Factual Statements About Termite Control Tenting 5 Easy Facts About Termite Control Techniques Described

How Termite Control Technician Job Description can Save You Time, Stress, and Money.


Garden beds and plants should be kept away from direct contact with walls. Hard paving should be substituted.

Leave a Reply

Your email address will not be published. Required fields are marked *